Quality & Compliance
Your due diligence starts here.
One page for every trust signal procurement and engineering teams need to complete a supplier evaluation: certifications, QC process, third-party inspection policy, warranty terms, and downloadable documentation.
Three Compliance Pillars
Global baseline + market-specific approvals + product-category compliance.
International Certifications
Product safety and performance certified globally. All JUSTSOLAR modules comply with the baseline required in every major market.
- TUV Rheinland
- IEC 61215
- IEC 61730
- UL 61730 / UL 61215
- CE Mark
- ISO 9001:2015
- ISO 14001
- ISO 45001
Market-Specific Approvals
Additional certifications for regulated markets. Most are available on-request; timing depends on your tender or customs requirements.
- MCS (United Kingdom)
- BIS + ALMM (India)
- INMETRO (Brazil)
- RETIE (Colombia)
- SEC/ESMA (Saudi Arabia / UAE)
- CEC (Australia)
- NRCS (South Africa)
Battery & System Compliance
LiFePO₄ batteries, hybrid inverters, and microinverters carry full transport and safety certifications required for international shipment and installation.
- UN38.3 (Li-Battery Transport)
- MSDS (Material Safety)
- IEC 62619 (BESS safety)
- IEC 62109 (Inverter safety)
- UL 9540 (Residential storage)
- RCM (Australia)
9-Step Quality Control
Every module passes through 9 QC checkpoints before it leaves the factory — no sampling, no exceptions.
Raw Material Incoming QC
Every batch of cells, glass, EVA/POE, backsheet, junction box, and frame is inspected against spec before entering the line.
Automated Optical Inspection
In-line cameras check cell alignment, solder joints, and string spacing at every stage.
EL Testing (100% of modules)
Electroluminescence imaging detects micro-cracks, broken fingers, cold joints — all invisible defects. Every module, no sampling.
Flash Test + Power Binning
Each module flash-tested under STC. IV curves recorded with serial number. Positive power tolerance only (0 / +5W).
Wet Leakage + Insulation Test
IEC 61730-2 compliance verified. No rework policy — failed modules scrapped, not re-tested.
AQL 2.5 Visual Inspection
Final visual inspection at AQL 2.5 sampling. Frame integrity, label accuracy, junction box seal all verified.
Pre-Shipment Inspection (optional)
Buyer-initiated. We host SGS / TUV / BV / Intertek at no charge — you book and pay the agency directly.
Packaging + Loading Supervision
Wooden crates, foam corner protectors, FCL-only. Our team supervises loading — not the freight forwarder.
Documentation Pack
Every container ships with flash list, EL image archive, COA, Certificate of Origin, packing list, and warranty card.
Third-Party Inspection Always Welcome
We host SGS, TUV Rheinland, Bureau Veritas, Intertek, or any agency of your choice at no cost to us. You book and pay the agency directly. Standard scope: AQL 2.5 visual sampling plus EL and flash test spot check. Scope extensions (PID, hot-spot, degradation sampling) negotiable.
For orders over 20 MW, we support residency inspection — an inspector from your chosen agency sits in the factory for the entire production run.
Document Library
Direct download — no form required. For extended due diligence pack (under NDA), contact us.
Product Documentation
Warranty & Reliability
Corporate
Due Diligence FAQ
What's included in a JUSTSOLAR compliance / due diligence pack?
Can I perform a factory audit before placing the order?
Which third-party inspection agencies do you accept?
Do your modules have UL certification for US market?
How do you compare to BNEF Tier-1 manufacturers on bankability?
What's the process for a warranty claim?
Request a Due Diligence Pack
One-email delivery: certifications, factory audit report, warranty terms, ISO documents, reference installations, and insurance coverage. Extended NDA pack available for utility-scale procurement.