Skip to main content
🇧🇷

Solar Panels for Brazil
INMETRO Ready, Factory-Direct (2026)

Brazil is the 5th largest solar market globally with ~50 GW installed and +15 GW added annually. JUSTSOLAR supplies INMETRO-compatible TOPCon + HJT modules direct from our 2GW factory — CIF Santos/Itapoá/Pecém, full Brazilian tax guidance, Portuguese-speaking support.

Brazil Solar Market 2026

Installed (end 2025)
~50 GW
5th largest solar market globally
2026 Forecast
+15 GW/yr
GD + mini + GC combined
GD (distributed gen) Share
~60%
5MW and below systems
Avg Yield (kWh/kWp/yr)
1,400-1,800
NE Brazil best, South moderate

Shipping to Brazil — 6 Principal Ports

Transit times and freight from Shanghai, by region.

Santos (SP)

Transit: 42-48 days
Freight: $4,500-5,200 per 40'HQ

Principal port; congestion Q4 (sugar season)

Itapoá (SC)

Transit: 40-46 days
Freight: $4,400-5,000 per 40'HQ

Best alternative to Santos, growing hub

Paranaguá (PR)

Transit: 42-48 days
Freight: $4,500-5,100 per 40'HQ

South + Southeast distribution

Pecém (CE)

Transit: 38-44 days
Freight: $4,200-4,800 per 40'HQ

Northeast gateway, fastest transit

Manaus (AM)

Transit: 50-58 days
Freight: $5,200-6,000 per 40'HQ

Zona Franca — tax benefits for industrial

Salvador (BA)

Transit: 40-46 days
Freight: $4,300-4,900 per 40'HQ

Northeast alternative

Brazil Solar Import FAQ

Do I need INMETRO certification for solar panels in Brazil?

Depends on segment. Retail/residential rooftop (up to ~75kWp): INMETRO portaria 004/2011 required. Commercial/industrial (75kWp+): IEC 61215+61730 typically sufficient, verify with your local distributor (CEMIG, CPFL, Enel, etc.). Utility-scale (GC auctions): EPE compliance documents required. JUSTSOLAR provides both certification paths — tell us segment before ordering.

What's the import cost structure for solar panels into Brazil?

Import tax (II): currently 0% for solar modules (exempted for energia solar). PIS/COFINS: ~9.25%. ICMS varies by state (17-25%). IPI: 0% for modules. Total nationalization cost: ~25-35% on top of CIF value. Zona Franca de Manaus has significant tax reductions for industrial buyers.

Which Brazilian port is best?

For São Paulo/Southeast: Santos (principal but congested Q4) or Itapoá (growing hub, less congestion). For Northeast: Pecém (fastest, ~38-44 days). For South: Paranaguá or Itapoá. For Amazônia industrial projects: Manaus (Zona Franca benefits). We book based on your final destination and current port congestion.

Can I get modules faster through Pecém (Northeast)?

Yes — Pecém is the fastest Brazilian port from Shanghai (38-44 days vs 42-48 Santos). It's ideal for Bahia/Pernambuco/Ceará/Paraíba projects. BNB (Banco do Nordeste) finance is also more efficient from Pecém. For São Paulo or South Brazil, Pecém adds inland trucking cost — compare total delivered cost before choosing.

What payment terms for Brazilian buyers?

New clients: 30% T/T deposit + 70% before shipment (regional risk policy). Established clients with good history: 30% + 70% against B/L copy. L/C accepted from Itaú, Bradesco, Banco do Brasil, Santander Brasil, Caixa, BTG Pactual for 5+ container orders. We quote in USD always — conversion to BRL at your bank.

Is Brazil's GD market (distributed generation) still attractive?

Yes, even after Lei 14.300/2022 transition. The law phases in grid-use fees over 2023-2028, but already-installed systems grandfather in. New installs still deliver 4-6 year payback in most states. Market is moving to commercial/industrial (C&I) where economics are strong. JUSTSOLAR's 600W TOPCon is the sweet-spot for 1-5MW C&I projects.

Who are your Brazilian customers?

We supply EPCs doing 10-50 MW commercial/industrial projects, distributors in São Paulo/Minas Gerais/Paraná, and integrators in 20+ Brazilian states. Portuguese support via Frank on WhatsApp — fluent in Brazilian Portuguese business communication. Also see our Portuguese site for Brazil-specific content.

Ready to Import Solar to Brazil?

WhatsApp Frank — English or Portuguese — for a firm quote CIF your preferred Brazilian port. Response under 30 minutes.