Skip to main content

LCOE Calculator
Levelized Cost of Energy (2026)

Calculate the true cost per MWh of your solar project over 25 years, accounting for CAPEX, OPEX, degradation, and discount rate. Utility-scale standard for project finance + PPA benchmarking.

Typical 2026: $450-700/kWp utility ground-mount, $800-1200 C&I rooftop

Typical: $5-10/kWp/yr utility, $8-15 C&I rooftop

Advanced Parameters

Your LCOE Analysis

LCOE (Levelized Cost of Energy)
$44.4
per MWh ≈ $0.044/kWh
Total CAPEX
$6.50M
$650/kWp × 10 MW
Module Cost
$1.10M
17% of CAPEX @ $0.11/W
Year-1 Generation
15.00 GWh
Capacity factor 17.1%
25-yr Generation
353 GWh
After degradation
Indicative Project Finance Metrics
Break-even grid price
$0.044/kWh
At 30% margin sale
$0.058/kWh
Approx. equity IRR
40.3%
Approx. equity payback
2.5 years

Simplified project finance — real IRR depends on debt cost, PPA tariff, tax, inflation. Use for screening.

Get Module Quote for This LCOE

Email me these results

Save your inputs + results for reference. Frank will follow up within 30 min if you want a firm quote.

We email your results once. No spam — your data goes only to Frank.

2026 LCOE Benchmarks

Utility-Scale (Atacama)
$18-28/MWh
Record-low DNI regions (Chile, Saudi, Egypt)
Utility-Scale (typical)
$30-50/MWh
Most favorable markets, 50+ MW ground-mount
C&I Rooftop
$50-90/MWh
Commercial/industrial distributed generation

Reducing module $/W by $0.02 (e.g., JUSTSOLAR factory-direct vs distributor Tier-1) on a 10MW project saves ~$200K CAPEX → reduces LCOE by $1-2/MWh. Over 25 years of 1.5M MWh generation, that's $1.5-3M in incremental project value.