Skip to main content
🇹🇷

Solar Panels for Turkey
YEKA + Agricultural Self-Consumption (2026)

Turkey installed ~15 GW solar and targets 30 GW by 2030 under YEKA tender program. Agricultural self-consumption (farmland + greenhouse) is the fastest-growing segment. JUSTSOLAR ships CIF Istanbul/Mersin in 22-28 days.

Turkey Solar Market 2026

Installed (end 2025)
~15 GW
Rapid growth under YEKA tender programs
2030 Target
~30 GW solar
2022-2035 Strategic Plan
Agricultural Self-Consumption
~3 GW
Farm + greenhouse boom
Avg Yield (kWh/kWp/yr)
1,500-1,800
Southern/central Anatolia best

Shipping to Turkey

Transit and freight from Shanghai via Suez.

Ambarlı (Istanbul)

Transit: 22-26 days
Freight: $2,500-3,200 per 40'HQ

Principal container port, Marmara region

Mersin (Mediterranean)

Transit: 22-28 days
Freight: $2,500-3,200 per 40'HQ

Southern Turkey + agricultural regions

İzmir (Aegean)

Transit: 23-28 days
Freight: $2,500-3,200 per 40'HQ

Aegean coast + agricultural regions

Gemlik

Transit: 22-26 days
Freight: $2,500-3,200 per 40'HQ

Marmara alternative, Bursa industrial

Turkey Solar Import FAQ

What certifications are needed for solar panels in Turkey?

IEC 61215 + IEC 61730 required (we provide). EPDK (Energy Market Regulatory Authority) licensing for grid-connected installations. TSE (Türk Standartları Enstitüsü) compliance for retail products. For YEKA (Renewable Energy Resource Area) tender projects: full bankability + TSE approval. For unlicensed generation under 5 MW: simpler process. JUSTSOLAR provides full cert bundle.

What's the import cost structure for Turkey?

Solar modules: 0-5% import duty (depends on HS classification). VAT (KDV): 18-20%. Additional safeguard measure for some solar products (~14-25%) — check current status with Turkish customs broker. Some fluctuation during TRY volatility. Agricultural self-consumption projects sometimes get reduced VAT. USD invoicing critical due to TRY FX risk.

What's the YEKA tender program?

YEKA = Yenilenebilir Enerji Kaynak Alanları (Renewable Energy Resource Areas). Government-designated zones for utility-scale renewable tenders. Winners get land lease + connection + tariff for 25 years. Strong tariff floor in USD ($/MWh). JUSTSOLAR can supply YEKA winners with bankable documentation (Tier-1 wrap available if strict BNEF required). Ask Frank for fit assessment.

Why is agricultural self-consumption booming in Turkey?

High electricity tariffs + TRY FX volatility + agricultural irrigation needs. Farmers installing 50-500 kWp on farmland (alongside irrigation pumping) save 60-80% on energy costs. Government supports with simplified licensing. Southern Anatolia (Antalya, Konya, Adana) has highest yield + biggest market. JUSTSOLAR 600W TOPCon dominant for 100-500 kWp agricultural installations.

What payment terms for Turkish buyers?

Turkey has TRY volatility — elevated FX risk for exporters. Established Turkish clients: 30% deposit + 70% against B/L copy possible. New clients: 30% + 70% before shipment. L/C accepted from Türkiye İş Bankası, Garanti BBVA, Akbank, Yapı Kredi, Ziraat Bankası for 5+ container orders. USD only (TRY not international).

Is Turkey a hub for re-export to Central Asia?

Yes for some flows. Turkish distributors serve Azerbaijan, Georgia, Turkmenistan, and parts of Iran via overland routes. CIS country buyers sometimes prefer to procure via Turkey for proximity + USD banking. Ask Frank about multi-country distribution structures.

Türkiye Solar — YEKA + Agriculture

WhatsApp Frank for CIF Istanbul/Mersin quote.

WhatsApp Frank